Select all that apply. A and B must both be ticked before sign-off.
Block
Specific area
Level
Mast climber
Subcontractor *
Drawing references
Fire-barrier / benchmark drawing refs for this area.
Pre-installation checks *
A = Installer · B = Manager. Both columns required.
#
Check
A
B
Comment
Pre-install sign-off *
Both the subcontractor and QFL PM must sign that they are happy with the pre-install checks before installation evidence can be filled.
Subcontractor
Not signed
QFL PM
Not signed
Uses your enrolled manager signature (My signature).
Installation checks *
Answer each requirement Yes / No / N/A. A Yes needs 3–7 evidence photos (minimum 3). Photos stay on this form only (not the Site Photos gallery). Tap a thumbnail to view full size.
Installer signature *
Drawn on this form by the installer. Name and signature both required before issue.